Work Starts on New Hyatt Field Turf
June 18th, 2014 by iPhone
Groundwork is now underway at Hyatt field, as heavy equipment are currently removing the existing grass from the football field.
The field’s 2 inch downward slope will be repaired, then a drainage system will be installed. A bed of “rubber pellets” will be late before the turf is put down, for stability and drainage.
The work is expected to be completed in time for this year’s Billie football season
Choose another article
Newer article: Local Couples’ Granddaughter Competing in Miss Arkansas
Older article: Courthouse Water Leak Repaired