Monticello Live

Monticello's Daily News

Edward Jones Mainline Health Systems
Arkansas Hospice Baptist Health Medical Center Drew County

Search

BIBLE

CLASSIFIEDS

Pines Broadcasting Company

Pines Broadcasting Company

OBITUARIES

LOCAL WEBSITES

Avocados

Avocados

ASFCU

ASFCU

One 11 Southern Graphics 1

ONE11 Southern Graphics

Cass Martin Realty

Cass Martin Realty

Delta Memorial Swing Bed_A

Delta Memorial

Mingo Computer Consulting

Mingo Computer Consulting

Advertise With Monticello Live

City Drug

City Drug

Prescription Pad Pharmacy

The Prescription Pad Pharmacy

War Eagle Boats

Farmer’s Insurance Two

One 11 Southern Graphics 2

ONE11 Southern Graphics

Dallas County Medical Center_A

Dallas County Medical Center'

Ray Ryburn Real Estate

Ray’s

Clearview

UAM Sports

UAM Sports

UAM News

UAM News

Monticello Exxon

Monticello Exxon

AM Rental & Sales

AM Rental & Sales

Searcy & Associates

Searcy & Associates

State Farm Mark Gray

Delta Memorial Swing Bed_B

Delta Memorial

Monticello Tire (Goodyear)

Monticello Tire (Goodyear)

Merchant & Planters Agency, INC.

Merchant & Planters Agency, INC.

O’Fallon Vet

0'Fallon Vet

Secure Storage 2

Bradley County Medical Center

Commercial Bank

Dallas County Medical Center_B

Dallas County Medical Center'

Head of the Class

Monticello Animal Clinic

Monticello Animal Clinic

ESA Staffing 2

UAM A

Be A Weevil

Lake Dam (Levee) Repairs Expected to Cost $1/2 Million – Video

January 27th, 2017 by


Here’s the report from the engineer.

• We have prepared a set of drawings to address all of the issues related to dam safety that were identified by the State.
• The plans were reviewed and approved by the State.
• Mayor Tucker had talked to the City staff to determine if the City staff could possibly complete the required repairs.
• In my last conversation with him, he indicated that the project should be bid out because the City does not have the necessary man power and required equipment.
• However, he did not ask me to proceed with the bidding.
• I concur with the conclusion that Mayor Tucker made at the end.
• Our best guess (we are unable to estimate accurately the cost of pulling all the ripraps (large rock) on the upstream face of the dam that have fallen to the bottom of the dam and placing additional larger ripraps) for the construction would be $450,000 to $550,000.

Choose another article

Newer article: Edell August Usry

Older article: $9,500 Off Select 2017 Chevrolet Trucks, Now Through Jan. 31st

Leave a Reply

Malco Theater 1

Farm Bureau

Mr. Bug

Mr. Bug

UAM Trotter House B

UAM Trotter House

Union Bank 2

Immanuel Baptist Church

ESA Staffing

BCMC Family Care Clinic 2

Drew Farm

Burgess Process Service

Burgess Process Service

Baker’s Electrical

Baker's Supply

Quality Plus Dry Cleaners

Quality Plus Dry Cleaners

Malco Theater 2

Union Bank 1

Mullis Insurance

Sammy Mullis Insurance

La Terraza

UAM B

Be A Weevil

Small Bites Pediatric Dentist

Farmer’s Insurance One

Citizen’s Bank 2

Citizen's Bank

Seark Motorsports

Seark Motorsports

Monticello Realty

Monticello Realty

Bone’s Auto Parts

Bone's Auto Parts

SEEMS

UAM Trotter House A

UAM Trotter House

A.J. Huffman Graphic Design

Frazer’s Funeral Home

Frazer's Funeral Home Warren

South Arkansas Business Solutions

Searcy & Associates 2

Searcy & Associates

AGUp Equipment

Citizen’s Bank 1

Citizen's Bank

BCMC Family Care Clinic 1